Get in touch.

Say hello

T: 01298 812371
F: 01298 812237
E: info@hdsharman.co.uk

Find us

HD Sharman Ltd.
High Peak Works,
Chapel-en-le-Frith,
High Peak,
Derbyshire SK23 0HW

Bespoke moulded units

Bespoke moulded units

Sharmans range of bespoke moulded units are a key component of the market leading BBA certified Plygene Gutterline refurbishment system.

Vacuum formed at our manufacturing works to the bespoke profile of the existing gutter, they provide complete quality assurance in the traditionally problematic areas of high gutter complexity to ensure guaranteed leak prevention.

Engineered prefabrication of the units also significantly reduces the substrate preparation works required and the installation time to minimise building disruption.

Manufactured to cloak the existing detail, they are mechanically fixed and welded to the system liner to eliminate the risk of water ingress. Moreover, forming part of a system designed to move independently of the substrate, they are not susceptible to splitting through thermal movement that’s associated with bonded membranes.

Finally, each bespoke moulded unit is fully water tested in the manufacturing process to provide the systems 25 year guaranteed performance.

Component Production Video Guide

Bespoke moulded units
Format: Video

Bespoke moulded units

Quality assured through our technical specification support

We provide high levels of technical support with specifications, access to technical libraries, including technical information and system specification, CPDs and dedicated system training programmes for specifiers.

Quality assured through our Trained Contractor Network

Rigorous ongoing training, site inspections and audits of our registered Trained Contractor Network ensures full quality control at the point of installation.

We are here to support you

From dedicated technical support to CPDs. We understand the challenges faced in the gutter environment and how we can help you to specify the right system. We are always at the end of a phone to talk through your specific needs.

Why choose Plygene® Gutterline?

Our Experience

See all case studies

DHL

Factory engineered to meet this complex site challenge. When Midlands-based facilities management and construction specialists Oakley Industrial Services were asked to provide a fully extended lifecycle solution to 1,400 linear…

M.T. Construction

“Plygene® Gutterline is specifically engineered to be seamless…anything with joints will always have the potential to leak.” M.T. Construction of Colchester have been an approved installers of Plygene Gutterline since 1998….

Tesco

“Plygene® Gutterline is a value added service for my clients and I am 100% confident in it every time.” Brian Steel of Steel Roofing in Castleford has been working with…

Gutter and Roof Talk

See all articles

Guide to gutter maintenance

Provisional Met Office figures released at the beginning of January showed that 2014 was the UK’s fourth wettest year since records began in 1910. Furthermore, five of the UK’s six…

Refurbishing metal roofs – to seal or not to seal the overlap?

As the market leader in gutter and metal roof refurbishment systems, the most important consideration for Sharmans is to provide industry best practice on extending building life cycle performance. It’s…