Get in touch.

Say hello

T: 01298 812371
F: 01298 812237
E: info@hdsharman.co.uk

Find us

HD Sharman Ltd.
High Peak Works,
Chapel-en-le-Frith,
High Peak,
Derbyshire SK23 0HW

Component Fitting – Videos

We are here to help you and these easy-to-follow, how-to guides show you how to install the main components of the Plygene Gutterline system.

Component Fitting Video Guides

Component Fitting 1: Standard stop end set
Format: Video

Component Fitting 1: Standard stop end set

Component Fitting 2: Fit liner
Format: Video

Component Fitting 2: Fit liner

Component Fitting 3: 2 Part thimble outlet
Format: Video

Component Fitting 3: 2 Part thimble outlet

Component Fitting 4: Split thimble fitting
Format: Video

Component Fitting 4: Split thimble fitting

Component Fitting 5: Moulded weldable stop end
Format: Video

Component Fitting 5: Moulded weldable stop end

Component Fitting 6: Side outlet
Format: Video

Component Fitting 6: Side outlet

Tender pricing support

We are here to help you.

The system guide

Installation and technical guidance to ensure the system is installed to the highest level of standard, meeting the 25 year guarantee requirements.

Technical resources

We have an extensive library of technical resources including technical drawings and datasheets.

Gutter Talk

See all articles

Guide to gutter maintenance

Provisional Met Office figures released at the beginning of January showed that 2014 was the UK’s fourth wettest year since records began in 1910. Furthermore, five of the UK’s six…

The challenge to refurbish gutters with syphonic drainage outlets

Originally developed in Scandinavia in the 1960s, syphonic drainage became increasingly specified in the UK from the late 80s on large commercial and industrial buildings. As a principle, syphonic drainage…